A view of the cabin with the new generator shed. Greg basically built it himself over the past couple of months. It makes running the generator a lot quieter and provides storage for all of the tools that were in the kitchen area.
Getting all of the tools out of the cabin meant that we could start on the kitchen. Greg moved the refrigerator, painted the wall and put up boards on the other walls and ceiling.
Then, Greg built the pantry, and Jennifer organized it. We also built a beverage station at the outside of the pantry.
We also started on the countertop and plumbed the kitchen sink.
Jennifer likes the new shelves that hold the dishes and the toaster oven.
We also finished the trim in the bathroom.
Greg also built a bed under the stairs for company. It folds up under the stairs so that it's out of the way when not needed.
He also built a stand for the plaster cast of a bear print that Jennifer's parents gave us.
We also built a tractor and boat shed. Some neighbors gave us the metal roofing, and we used the tractor to build it. Greg would get in the bucket and hold on while Jennifer lifted him up.
We had a variety of weather this winter. Sunshine as well as snow, sometimes all in the same day.